Field Notes...

Effective lay rate of 330 blocks per hour
Tablet-based human machine interface
Three FBR personnel

The flagship next-generation Hadrian X® successfully completed Factory Acceptance Test at FBR's Perth facility with CRH personnel present to witness the build.

The test structure was completed at an effective lay rate of 330 blocks per hour, exceeding the required effective lay rate of 285 blocks per hour, utilising a tablet-based human machine interface and three FBR personnel.

View more projects

TECHNICAL SPECS

Type: Commercial
Partner: CRH Ventures
Layout: Test Structure
Wall Area:  54 sqm
Wall Length: 21 m
Block Type: Besser Block (US-format Concrete Masonry Block)
Block Size: 397mm (15.63") x 194mm (7.64") x 191mm (7.52")
Blocks Laid: 751
Status: Completed (Feb 2024)

FBR Technology